Surveys and Sampling

AMS enjoys a good reputation working in partnership with construction industry contractors and property developers, particularly when the property is occupied requiring a sympathetic approach and empathy for the client’s needs.

AMS will always go to great effort in difficult situations to satisfy their clients’ requirements with the minimum of disruption.

Company Profile

AMS is a company comprised of an excellent, well motivated team of experienced ARCA trained personnel determined to ensure the safe determination and removal of materials containing asbestos and other regulated substances.

AMS provides an efficient, reliable and safety-conscious service which is at all times cognisant and in compliance with the Health and Safety at Work Act 1974, the Control of Asbestos Regulations and applicable associated regulatory requirements.

AMS Asbestos RemovalAMS Asbestos Surveys

Following a comprehensive type 3 (fully intrusive) survey of a large, four storey hotel building located at a military establishment in Oxfordshire, undertaken by AMS, considerable asbestos removal works were specified by the client in consultation with a specialist project management company.

The project consisted of the removal of large amounts of asbestos insulating board materials throughout all of the bedrooms, bathrooms and circulation areas of the 186 bedroom hotel building.

The asbestos removal works also included the environmental clean of the contaminated service riser ducts throughout the building and a number of large plant rooms, together with encapsulation works and a subsequent environmental clean within an under-ground services duct. This phase of the works required entry into confined spaces, and AMS were able to provide fully trained operatives holding appropriate confined space qualifications.

Timescales were of a primary concern to the client as the hotel was closed for the duration of the asbestos removal works and AMS completed the works, together with additional works specified after the commencement of the project, ahead of the agreed completion date and within budget.

AMS worked closely with the client to ensure that the works were undertaken with the minimum of disruption and so that the works could be phased to allow the client to proceed with the refurbishment of the hotel at the earliest opportunity. This involved the simultaneous removal of asbestos containing materials on all floors of the hotel.